ATO Model Item
ATO Model item means that there will be some option items.
We can select any of those option items & create a new item. Consider a
situation where we want to assemble a CPU. We will be having a wide range of
choices for motherboard, RAM, processor, hard disk & cabinets. We can pick
different brands and models & come up with a new item all together.
An ATO Item is something like a ceiling fan kit which we buy
from market. Always it will have same configuration. Our job is to just
configure it
As we have not installed Manufacturing modules for our
Operating unit. So we will do all setups in Vision Instance
Add ‘Order Management
Super User, Vision Operations (USA )’
responsibility to our user
In our case, we’ll configure a printer which can be
configured differently using different option items. In our case order is
placed for V1 organization but manufacturing will be done in M1 organization
Define an item in Item Master
Navigate to tools > Copy from & give details as
Click on Apply
& assign this item to M1 organization as well
Change Organization to M1
Navigate to Bills of Material > Routings > Routings
Routing means the departments which will be involved in
manufacturing this item
Give item name
& navigate to Tools > Copy routing from & give
details as shown below
Click on Copy. You’ll get a message saying
Press OK
We can see that 3 departments are copied. 1 is for assembly
of printer other is for testing of laser printer & third is for testing of
Ink jet printer. Depending upon the type of printer we’ll chose, it will be
routed to either 2nd or 3rd department
Navigate to Tools > Bills of Materials & give item
name
Navigate to Tools > Copy bill from & give details as
Click on Copy
Press OK
We can see that entire configuration is copied
At line 4 we have an Printer Option Class. Option class
means a group of optional items. We’ll select any one of these items in option
class. In our case it is Inkjet or Laser printer
Navigate to Tools > Create Common Bill & give details
as shown below
Press OK
It will submit a concurrent program ‘Create Common Bills’.
Once that completes normally we can proceed with order booking
Next is to book an order & give details as shown below
Click on Configurator Tab
As there is some inbuilt problem in this page so if
required, click on Diagnostics & then click on Back
Select the options as shown below
Note that for Printer option class we have 4 options but we
can select only one
Click on Finish
Book the order
Right Click on the line & click on Progress Order. With
this a new line will be added to the configuration.
It is known as Star item. It is created so that in future if
someone is willing to book an order with same configuration then instead of
selecting all options, He can directly select this Star item. Also only for
this item, this item, the status will change to ‘Supply Eligible’. Now this
item will only be sent for production
Right click again on star item & click on Progress Order
Press OK. This will create a Move order in WIP
You’ll get a message saying
It will submit ‘Assemble To Order Mass Load
Report’ concurrent program. Open the output file
& note the job number
Now the status of line is ‘Production Open’
Navigate to WIP > Discrete > Discrete Jobs à
Search for the job number
In order to start the production of the item, we need to
release the job. Change the status of Job to Released
It will populate the subinventory details. Save the record
Navigate to WIP > Move Transactions
> Move Transactions à Search By Job number
Click on Complete & give details as shown below
Save the record. It means that the item has been
manufactured & sent to inventory.
Go to Sales order form & see the line status
It is ‘Awaiting Shipping’
Go to shipping transaction form & do ‘Pick Release’
‘Ship Confirm’ the order
Run ‘Workflow Background Process’. Line status will be
closed
Hi Vipul,
ReplyDeleteHow the pricing is done for Star item
When you book the order, a new line (star item) gets added with price as 0.00. System internally calculates the price of individual parts & shows the line total as the sum of these individual parts.